Before installing siding make sure that flashings are installed to prevent moisture from entering wall and roof spaces.
Cedar shingle roof installation guide.
Joints in any one course should have a side lap of no less than 38mm from the joint in adjacent courses and in any 3 courses no 2 joints should align.
To ensure you are reading the latest edition of the roof manual please contact our office.
Use a hammer stapler to fasten it down applying a staple every 12 to 14.
How to install a cedar shingle roof on a garden shed step 1.
Before installing the shakes the roofer covers the roof deck with 15 or 30 pound roofing felt.
Flashing is an important line of defense in controlling moisture in wall assemblies.
Cover the roof with roofing felt.
Click on the below links to view the full application instructions for.
Return to all blogs.
Position the first shingle so its end overhangs the edge of the roof by 1 1 4 to 1 1 2 inches.
Lap rows of 36 inch wide felt using the provided lap lines as guides.
Shake shingle roof application instructions feb 10 2017.
A guide to installing cedar shingles.
Looking for a dealer in your area.
Check the felt paper.
Secure it to the.
Cedar shingle application cedar shake application.
As with the roofing shingles make sure to leave a gap of 1 8 to 1 4 between each shingle to allow for expansion.
This document will help you with the installation of your cedar shake and shingle roofs.
The shingles shall be spaced 6mm apart and be nailed or stapled twice the nails staples should be fixed 19mm in from the edge and 38mm above the butt of the course above.
On the left side of the page in the blue section under the heading supporting documents you will find our care maintenance brochure or click here for more information.
The jb western red cedar shingles from marley are a lightweight roofing and cladding solution with a high degree of natural thermal insulation.
For information regarding the installation and maintenance of your cedar shake or shingle application visit our website for a complete list of resources.
Using this chalk line method extend the first row around the entire shed.
Flashing intercepts and directs the flow of water away from the building to designed drainage paths.